The ice-resistant fixed platform (IRFP) with a drilling package is part of the first-phase field development facilities at V. Grayfer field.
The field is located 160 km from the port of Astrakhan, 100 km from the western coast of the Caspian Sea, and 8.5 km from the V. Filanovsky field.
LocationCaspian Sea
TypeIce-resistant fixed platform with drilling facility
Scope of workProcurement of equipment and materials, fabrication and commissioning
Year2018 – 2023

Weight-and-dimensional characteristics:
Support structure No. 1:22,9 х 37,8 х 16 m.
Support structure No. 2:16,3 х 37,8 х 16 m.
Weight Support structure No. 1 & No. 2:3 493 t
Piles:Dimensions 21,34 х 77 / 74 m. Weight: 2 796 t / 17 nos
Topside:Dimensions 96 х 50 х 78,8 m. Weight: 9 117 t
The following will be installed at the ice-resistant fixed platform:
- drilling facility provided for drilling a cluster of 25 wells;
- operation and process equipment spread;
- power equipment spread.
The ice-resistant fixed platform (IRFP) with a drilling package is included in the facilities developed as part of the first stage of the V. Graifer field development.